Phase 5 – Additional Detailed Construction Drawings

Depending on the nature and scope of the project, the drawings required for Building Permit are less detailed than what is required to convey all the information to the builder for construction purposes. A project that is more complex in nature will benefit from a higher level of coordination to facilitate the building process and maintain the integrity of the design. The amount of drawing and level of detail is often variable and can be negotiated at such time to meet the needs of the project.

Typically included in these drawings are the following: